Commercial Interior Design Company In Dubai
Office, retail, showroom, clinic and restaurant interiors in Dubai, designed, approved and built by one licensed contractor.
What Does A Commercial Interior Design Company Do?
A commercial interior design company plans how a business uses its space, then builds it. That covers the layout, ceilings, lighting, partitions, joinery and finishes, as well as the parts tenants often underestimate: the landlord NOC, fire and life safety approval, and power or AC changes that need sign-off before the space can open.
HFF Contracting & Interiors L.L.C holds Dubai commercial licence no. 1170369, issued by the Department of Economy and Tourism, for building contracting and for decoration design and implementation. Design, drawings, approvals and execution sit with one team.
- Trade Licence
- No. 1170369 Building contracting
- Spaces
- Offices, retail showrooms, clinics, F&B
- Small Office
- 4 to 6 weeks typical build duration
- Proposal
- 3 to 5 days after the site visit
Commercial Interiors For Each Type Of Business
An office, a showroom and a clinic can share a floor plate and still need completely different interiors. One is planned around desks and meeting rooms, another around how customers walk in and where they stop, the third around hygiene, privacy and a regulator who inspects before opening.
The brief comes first. Headcount, how many people are in the office on a normal day, how many meeting rooms are actually booked, what has to be stored, which parts of the space customers see. Those answers decide the layout long before finishes are chosen.
Offices
- Workstation and meeting room planning
- Reception and breakout areas
- Glass partitions and acoustics
- Power, data and lighting
- Cat A to Cat B fit out
Retail And Showrooms
- Customer flow and display planning
- Shopfronts and counters
- Feature ceilings and lighting
- Storage and back of house
- Mall and landlord approvals
Clinics And F&B
- Clinic layouts and treatment rooms
- Restaurant and cafe dining areas
- Kitchen and counter fit out
- Ventilation and drainage
- Sector approvals coordination
Hotels, restaurants and lounges are covered in more detail on hospitality interior design.
Shell And Core, Cat A Or Cat B
Ask the landlord which condition the unit is handed over in before budgeting. It changes the scope more than any design choice.
| Condition | What You Get From The Landlord | What Your Fit Out Covers |
|---|---|---|
| Shell and core | Structure, risers, a bare slab | Everything: MEP distribution, ceilings, floors, partitions, finishes |
| Cat A | Ceiling, base lighting, AC and a finished floor | Layout, partitions, meeting rooms, joinery and branding |
| Cat B or second-hand | A previous tenant's fit out | Strip-out of what does not suit, then the new layout |
Which Approvals Does A Commercial Fit Out Need?
Most commercial fit outs in Dubai need more than one sign-off, and the order matters. The landlord NOC comes first.
| Approval | When It Applies |
|---|---|
| Landlord or developer NOC | Every fit out, before any authority submission |
| Fit out permit | Dubai Municipality on most of the mainland; DDA or Trakhees in the areas they govern |
| Dubai Civil Defence | Any change to fire alarms, sprinklers, exits or escape routes |
| DEWA | When the space needs more electrical load |
| Food safety approval | Restaurant and cafe kitchen layouts |
| Health authority licensing | Medical clinics and healthcare spaces |
General guidance only. Some free zones run their own approval process, which is confirmed for your unit at the site visit.
From Brief To Opening Day
- 01
Brief And Site Visit
Headcount, functions, brand and budget are agreed, and the unit is measured. Free within Dubai.
- 02
Space Plan And Concept
Layout options, followed by a concept for finishes and lighting. 3D renders show the space before anything is built.
- 03
Fixed Price Proposal
An itemised proposal issued within 3 to 5 working days of the site visit, with inclusions and exclusions listed.
- 04
Drawings And Approvals
Working drawings go to the landlord for the NOC, then to the authority and Civil Defence where required.
- 05
Build
MEP first fix, partitions and ceilings, flooring, joinery from the HFF workshop, then lighting and final fixtures.
- 06
Inspections And Handover
Authority inspections, snagging and a clean handover so the business can move in.
What Drives The Cost Of A Commercial Fit Out?
HFF's indicative range for interior work is AED 200 to AED 1,500 per square foot. A small office fit out typically takes 4 to 6 weeks on site.
| Factor | Why It Moves The Price |
|---|---|
| Handover condition | Shell and core needs full MEP distribution; Cat A does not |
| Meeting rooms and glass | Enclosed rooms add partitions, AC zones, lighting and acoustics |
| Fire and life safety changes | New layouts often mean moving sprinklers and detectors, which needs approval |
| Kitchen or clinical areas | Extract, drainage and specialist finishes |
| Out-of-hours work | Malls and occupied towers often restrict noisy work to nights |
Questions To Ask Before You Commit To A Unit
- What condition is it handed over in? Shell and core, Cat A or a previous fit out. Get it in writing.
- What are the landlord's fit out rules? Working hours, deposits, approved contractors and drawing requirements.
- Is there enough power and AC capacity? Upgrades need DEWA approval and add time.
- Which authority governs the building? Mainland, DDA, Trakhees or another free zone. Each has its own process.
- Is there a rent-free fit out period? Compare it with a realistic programme, including approvals.



