Interior Design Company In Dubai

Interiors for villas, apartments, offices and restaurants, drawn, approved and built by one licensed Dubai contractor on one contract.

In Short
Dubai, UAE

What Does An Interior Design Company In Dubai Do?

An interior design company in Dubai plans a space's layout, lighting, materials, joinery and finishes, and produces the drawings that building management, the authorities and the contractor work from. A design-only studio stops at the drawings. A design-and-build company holds a contracting licence as well, so it also builds the interior and hands it over.

HFF Contracting & Interiors L.L.C is a design-and-build company based in Downtown Dubai. It holds Dubai commercial licence no. 1170369 for building contracting and decoration design and implementation, and works on homes, villas, offices and restaurants.

Trade Licence
No. 1170369 Dubai Economy and Tourism
Licensed For
Building contracting and decoration design and implementation
Interior Rates
AED 200 to 1,500 per sq ft, indicative
Office
Downtown Dubai Horizon Building, 5th Floor
Who It Is For

Interior Design For Homes, Offices And Restaurants

A two-bedroom apartment and a restaurant share the same design basics: plan the layout first, light it properly, choose materials that survive how the space is used. The constraints around them are very different, though. An apartment tower sets its own working hours and NOC rules. An office has to satisfy the landlord and Civil Defence. A restaurant kitchen needs a food safety layout approval before the joinery is ordered. Good interior design starts from those constraints rather than discovering them on site.

Homes And Villas

  • Apartment layouts and storage
  • Villa interiors planned across every floor
  • Kitchens, wardrobes and TV units
  • Bedrooms, living areas and majlis
  • Renovation of lived-in homes

Offices And Retail

  • Workstation and meeting room planning
  • Reception and client areas
  • Ceilings, partitions and lighting
  • Power, data and HVAC coordination
  • Fit out to landlord requirements

Restaurants And Cafés

  • Seating plans and customer flow
  • Bars and service counters
  • Kitchen layout coordination
  • Lighting and acoustic finishes
  • Layouts prepared for authority review

More detail on each: villa interior design, office and commercial interiors and restaurant and hospitality interiors.

Choosing

Design Studio Or Design-And-Build Company: Which Suits Your Project?

Dubai has plenty of both, and neither is right for every project. The real difference is who answers for the result when the drawing meets the site.

QuestionDesign-Only StudioDesign-And-Build Company
What you receiveConcept, drawings, material schedule and 3D visualsThe same drawings, plus the finished interior at handover
Who builds itA contractor you appoint and manage separatelyThe company that drew it
When the site differs from the drawingsDesigner revises, contractor re-prices, you sit in the middleResolved inside one team, with one variation if any
NOCs and permitsUsually the contractor's job, occasionally the designer'sPart of the same contract
Price certaintyBuild cost known only after contractors quoteDesign and build priced together
Best suited toOwners with a contractor they trust, or who want independent oversight of the buildOwners who want one party responsible from brief to handover

HFF works as a design-and-build company. It can also build from drawings prepared by another designer, reviewing them for site and approval issues before pricing.

Process

How An Interior Project Runs, From Brief To Handover

  1. 01

    Site Visit And Brief

    The property is measured and existing services are checked. Room use, style and budget range are discussed on site. The visit is free within Dubai.

  2. 02

    Space Planning

    Layouts, circulation and furniture sizes are fixed against the real dimensions before a single finish is chosen. Most expensive mistakes are made, or avoided, at this stage.

  3. 03

    Design Development And 3D

    Materials, ceilings, lighting, joinery drawings and a finishes schedule. 3D renderings let you approve what will be built instead of imagining it.

  4. 04

    NOCs And Permits

    Drawings go to building management and, where the work needs it, to the relevant authority. Site work starts once the permissions are in place.

  5. 05

    Fit Out And Joinery

    Trades run in sequence: MEP first fix, ceilings and partitions, flooring, joinery, then finishes. Getting the order wrong is how the same wall gets opened twice.

  6. 06

    Snagging And Handover

    A joint walk-through lists every defect. Each item is closed, the space is cleaned, and the interior is handed over to the agreed scope.

Approvals

Who Approves Interior Work In Dubai

Painting and new furniture rarely need more than the building's own consent. Once work touches partitions, ceilings, electrical load, plumbing, air conditioning or fire safety, a permit is normally required, and the issuing body depends on where the property is.

Authority Or PartyWhen It Is Usually Involved
Building management or master communityAlmost every apartment and community villa. Issues the NOC and sets working hours, deposits and access rules.
Dubai MunicipalityMost mainland Dubai properties: layout changes, fit out and villa modifications. Also approves food establishment layouts.
Dubai Development Authority (DDA)Properties inside the free zone communities that DDA regulates.
TrakheesAreas regulated by the Ports, Customs and Free Zone Corporation.
Dubai Civil DefenceChanges to fire alarms, sprinklers, exits or fire-rated walls. Standard on commercial and restaurant fit outs.
DEWAAdditional electrical load or new connections.

General guidance only. Requirements change and vary by building, so confirm the route for your property before the design is finalised. See authority approvals for how HFF handles submissions.

Budget

How Much Does Interior Design Cost In Dubai?

HFF's indicative range for interior work is AED 200 to AED 1,500 per square foot. New construction, such as a villa build, runs AED 400 to AED 2,000 per square foot. The spread is wide because two properties of the same size can need very different work. These are the factors that decide where a project lands:

FactorWhy It Moves The Price
ScopeDesign only, or design, permits and build under one contract
Area and room countMore rooms means more drawings, more joinery and more finishing
JoineryKitchens, wardrobes and wall panelling can take a large share of the budget
Materials and finishesPorcelain against natural stone, laminate against veneer, standard against custom lighting
MEP changesMoving plumbing, adding circuits or relocating AC ducts adds trades and approvals
PermitsAuthority fees, NOC deposits and consultant stamps where the work requires them
Access and working hoursBuildings that limit noisy work to set hours stretch the programme and the labour cost

Indicative ranges, not a quotation. The binding price is the written quotation issued after a site visit.

Whoever you hire, ask for a quotation that separates design fees, permits, materials and labour, lists what is excluded, and ties each payment to a finished stage of work. A single lump sum with no breakdown is hard to compare and harder to hold anyone to.

Services

Interior Design Services In Dubai

Villa Interior Design

A villa works best when it is designed as one house rather than a collection of rooms. Circulation, ceiling lines and finishes should carry from the entrance and majlis through to the bedrooms upstairs, with storage planned for the family that actually lives there. Details on scope and process are on the villa interior design page.

Apartment Interior Design

Apartments are mostly about space discipline. Furniture sizes, built-in storage and lighting have to be settled early, because floor area is fixed and natural light often comes from one side only. Tower rules on working hours and deliveries also shape the programme.

Office And Commercial Interiors

An office layout is driven by headcount, meeting needs and how teams work, then by landlord and Civil Defence requirements. Partitions, ceilings, lighting, power and data are coordinated before anything is built. See commercial design and fit out works.

Restaurant, Café And Hotel Interiors

In food and beverage spaces the kitchen and service routes decide the layout, and the dining room is designed around them. Seating density, acoustics, lighting and durable finishes follow. More on the hospitality interiors page.

Bedrooms, Joinery And Wall Cladding

Wardrobes, TV units, kitchen cabinets and wall panelling are made to measured dimensions rather than bought to fit approximately. See bedroom interiors and wooden cladding.

Drawings And 3D Visuals

Every project runs from 2D drawings used for permits and site work, and 3D visuals used for client sign-off. Both are also available as standalone services.

Renovating An Existing Space

Renovation starts with what is already there: existing services, structure and building rules. The renovation page covers how occupied homes and offices are handled.

Before You Hire

Five Checks Before Hiring Any Interior Design Company In Dubai

  • The licence covers the work. Dubai trade licences list specific activities. Whoever does the site work should have contracting on their licence, not only design consultancy.
  • You know who draws and who builds. If they are different companies, find out who pays when the drawings and the site disagree.
  • The scope is written down. Inclusions, exclusions, materials and brands, in writing, before the first payment.
  • Permits have an owner. Agree who applies for the NOC and permits, and who pays the fees and deposits.
  • Payments follow progress. Staged payments tied to completed work, with a final payment held until snagging is closed.

HFF Licence Details

ItemDetail
Company nameHFF Contracting & Interiors L.L.C
Commercial licence no.1170369
Issued byDepartment of Economy and Tourism, Government of Dubai
Legal formLimited Liability Company, single owner
Licensed activitiesBuilding Contracting; Decoration Design & Implementation Using 3D Printing Technology
Dubai Chamber membership no.452184
OfficeHorizon Building, 5th Floor, Office 1, Downtown Dubai

Details as shown on the licence issued by Dubai Economy and Tourism. Ask for a copy of the licence before signing with HFF or any other contractor.

Gallery

Residential And Commercial Interiors

Living room interior design with rattan pendants, built-in shelving and a dining corner
Master bedroom interior design with padded headboard wall, chandelier and cove ceiling lighting
Executive office interior design with timber desk, backlit shelving and recessed ceiling lights
Open plan office interior with white workstations, exposed black ceiling and pendant lighting

View Projects

Questions

Interior Design In Dubai: Common Questions

How much does it cost to hire an interior design company in Dubai?
HFF's indicative range for interior work is AED 200 to AED 1,500 per square foot. Where a project lands in that range depends on scope, joinery, materials, MEP changes and permits. The binding price is a written quotation issued after a free site visit within Dubai.
Do I need a permit for interior work in a Dubai apartment or villa?
Usually, if the work goes beyond painting and furniture. Building management or the master community issues an NOC first. Changes to walls, ceilings, electrics, plumbing, air conditioning or fire systems then need a permit from the authority for that area: Dubai Municipality for most mainland properties, or DDA or Trakhees in the zones they regulate.
What approvals does a restaurant fit out need in Dubai?
Beyond the landlord's approval and the fit out permit, a restaurant typically needs Dubai Civil Defence approval for fire safety and Dubai Municipality food safety approval of the kitchen layout. Gas and kitchen extraction can add further submissions, so the layout should be agreed before joinery is ordered.
What is the difference between an interior designer and a fit out contractor?
An interior designer decides what the space should be: layout, materials, lighting and details, shown in drawings and visuals. A fit out contractor builds it: partitions, ceilings, MEP, flooring, joinery and finishes. A design-and-build company such as HFF does both under one contract.
Can HFF build from drawings made by another designer?
Yes. HFF reviews the existing drawings and specifications first, raises anything that will not work on site or for permits, and then prices the build.
How long does an interior design project take in Dubai?
It depends on how much is being changed, how long the permits take for your building, and lead times on joinery and imported materials. A realistic programme can only be set once scope and materials are agreed, so get it in writing before work starts.
Is HFF Contracting & Interiors a licensed company?
Yes. HFF Contracting & Interiors L.L.C holds Dubai commercial licence no. 1170369, issued by the Department of Economy and Tourism, covering building contracting and decoration design and implementation.
Which areas does HFF work in?
The office is in Downtown Dubai and most projects are in Dubai. HFF also takes projects in Abu Dhabi, Sharjah and Ajman. Permit routes differ by emirate, so the property location is confirmed at the first call.