Interior Contracting Company In Dubai
Ceilings, partitions, flooring, joinery and MEP coordination for homes, offices and restaurants, built by a licensed Dubai contractor with its own joinery workshop.
What Does An Interior Contractor Do?
An interior contractor takes an approved design, or a clear brief, and builds it: partitions, false ceilings, flooring, wall finishes, joinery, lighting and the electrical, plumbing and air conditioning work behind them. The contractor buys the materials, schedules every trade, gets the fit out permit and hands over a finished space.
HFF Contracting & Interiors L.L.C holds Dubai commercial licence no. 1170369, issued by the Department of Economy and Tourism, for building contracting and for decoration design and implementation. Joinery is made in its own workshop in Al Quoz and installed by its own team.
- Trade Licence
- No. 1170369 Building contracting
- Joinery
- Own workshop Al Quoz, Dubai
- Indicative Rate
- AED 200 to 1,500 per sq ft, interior work
- Small Office
- 4 to 6 weeks typical build duration
What An Interior Contract Covers
Interior projects in Dubai rarely fail on design. They fail between the drawing and the site: a ceiling height that does not clear the AC duct, a wardrobe that arrives two centimetres too wide, a socket placed where the joinery now sits. An interior contractor is paid to catch those problems before they are built.
HFF reviews the design against the site before pricing it, then builds it in a fixed order. Because joinery is produced in-house, sizes are taken from the finished walls, not from the drawing.
Build
- Gypsum partitions and walls
- False ceilings and bulkheads
- Flooring, tiling and stone
- Wall finishes and paint
- Doors and ironmongery
Joinery
- Kitchens and vanities
- Wardrobes and storage
- Wall panelling and cladding
- Reception and counter units
- Made in the HFF workshop
Services
- Electrical and lighting points
- Plumbing and drainage
- AC and ventilation changes
- Fire alarm and sprinkler coordination
- Fit out permits and NOCs
Need the design as well? See interior design. Working on an office or shop? See commercial interior design.
Designer, Interior Contractor Or Design And Build
There are three common ways to run an interior project in Dubai. HFF works as an interior contractor on your drawings, or as design and build from the brief.
| Question | Designer Only | Interior Contractor | Design And Build |
|---|---|---|---|
| Who produces the drawings | The designer | You supply them | The same company |
| Who prices the work | Several contractors, after design | The contractor | Priced as the design develops |
| Who is responsible for site problems | Shared, often disputed | The contractor | One company |
| Best suited to | Owners who want to tender the build | Projects with final drawings | Owners who want one point of contact |
Shell And Core, Cat A And Cat B: What You Are Starting From
For commercial units, the condition of the space at handover changes the scope and cost more than anything else.
| Condition | What Is Usually There | What The Interior Contract Adds |
|---|---|---|
| Shell and core | Structure, risers and a bare floor plate | Ceilings, floors, MEP distribution, partitions and finishes |
| Cat A | Raised floor or screed, ceiling grid, base lighting and AC | Partitions, meeting rooms, joinery, branding and final MEP points |
| Cat B | A finished space from a previous tenant | Strip-out where needed, then the new layout and finishes |
How An Interior Project Runs
- 01
Site Visit And Brief
The space is measured and the drawings or brief are reviewed against what is actually on site. The site visit is free within Dubai.
- 02
Fixed Price Proposal
An itemised proposal listing materials, inclusions and exclusions, issued within 3 to 5 working days of the visit.
- 03
Shop Drawings And Permits
Ceiling, joinery and MEP shop drawings are prepared, and the NOC and fit out permit are applied for.
- 04
First Fix And Build
Electrical, plumbing and AC first fix, then partitions and ceilings, then flooring and wall finishes.
- 05
Joinery And Second Fix
Joinery made in the workshop is installed, followed by lighting, sockets, sanitary ware and fittings.
- 06
Snagging And Handover
A joint walk-through, every snag closed, authority inspection where required and a clean handover.
How Long Does Interior Work Take In Dubai?
Durations run from contract signature to handover. Authority approval time sits outside these figures and varies by area.
| Project | Typical Build Duration |
|---|---|
| Small office fit out | 4 to 6 weeks |
| Three bedroom villa interior | 8 to 12 weeks |
| Fixed price proposal after site visit | 3 to 5 working days |
How Much Does Interior Contracting Cost?
HFF's indicative range for interior work is AED 200 to AED 1,500 per square foot. Where a project lands depends on:
| Factor | Why It Moves The Price |
|---|---|
| Starting condition | Shell and core needs far more than a Cat A or a refurbishment |
| MEP changes | Moving AC, drainage or adding power points adds trades and approvals |
| Joinery quantity and finish | Veneer against laminate, custom against standard sizes |
| Flooring and wall materials | Natural stone and specialist finishes cost more to supply and install |
| Working hours and access | Night work, lift bookings and occupied buildings extend the programme |
What To Check Before Hiring An Interior Contractor
- The licence activities. Fit out involving MEP and partitions should be contracted by a company licensed for building contracting.
- An itemised, fixed price. Materials named by type and finish, so two quotations can be compared line by line.
- Who makes the joinery. In-house joinery means one company answers for size, finish and installation.
- Permits in writing. Who applies for the NOC and fit out permit, and who pays the deposit.
- Payment terms. HFF typically takes 30% on contract signature, staged payments against completed milestones and a final 10% on snag-free handover.