Renovation Contractors In Dubai
Home, villa and office renovation by a licensed Dubai building contractor. Permits, strip-out, MEP, joinery and finishes, run by one team on one contract.
What Does A Renovation Contractor In Dubai Do?
A renovation contractor in Dubai takes an existing home, villa or office and rebuilds the parts that need changing: layouts, ceilings, flooring, kitchens, bathrooms, electrics, plumbing and air conditioning. The contractor also secures the building NOC and any authority permit, runs the trades in the right order and hands the space back finished.
HFF Contracting & Interiors L.L.C holds Dubai commercial licence no. 1170369 for building contracting, and renovates apartments, villas, offices and restaurants from its office in Downtown Dubai.
- Trade Licence
- No. 1170369 Building contracting
- Renovates
- Apartments, villas offices and restaurants
- Indicative Rate
- AED 200 to 1,500 per sq ft, interior work
- Site Visit
- Free in Dubai written quotation after
Home, Villa And Office Renovation Under One Contractor
Most renovations in Dubai stall for the same reason: four or five trades each doing their own part, with nobody answerable for the gaps between them. The tiler waits for the plumber, the carpenter measures before the ceiling is fixed, and the building management office rejects a change nobody applied for. A renovation contractor exists to close those gaps.
HFF takes the whole job, from the first site measurement to the final snag list. That includes the paperwork, which on a Dubai renovation is often what decides the start date.
Apartments
- Kitchen and bathroom renovation
- Flooring and false ceilings
- Wardrobes and built-in storage
- Lighting and electrical upgrades
- Work within tower rules and hours
Villas
- Layout changes and extensions
- Full interior refurbishment
- Majlis, kitchen and bedroom upgrades
- MEP replacement
- Modification permits
Offices And Restaurants
- Partitions and meeting rooms
- Ceilings, lighting and HVAC
- Power and data points
- Kitchen and counter rework
- Civil Defence requirements
Planning a new interior from scratch rather than rebuilding an existing one? See interior design or interior renovation.
Main Contractor Or Separate Trades: What Changes For You
Hiring trades one by one can look cheaper on paper. Here is what each route puts on your plate.
| Question | Separate Trades | Renovation Contractor |
|---|---|---|
| Who plans the sequence | You do | The contractor |
| Who applies for the NOC and permits | Often unclear, sometimes nobody | Part of the contract |
| When one trade damages another's work | You negotiate between them | The contractor fixes it |
| Price | Several quotes, gaps between them | One itemised quotation |
| Best suited to | One small, self-contained job, such as repainting | Anything touching layout, MEP or more than two trades |
How A Renovation Runs, Step By Step
- 01
Site Survey
The space is measured and existing plumbing, electrics, AC and structure are checked. Problems hidden behind finishes are cheaper to find now than after demolition.
- 02
Scope And Quotation
An itemised quotation listing what is included, what is excluded and the materials allowed for. Nothing starts until the scope is agreed in writing.
- 03
Drawings, NOC And Permits
Layout and MEP drawings go to building management for the NOC, and to the relevant authority where the work needs a permit.
- 04
Protection And Strip-Out
Floors, lifts and corridors are protected, and the areas being renovated are stripped back. Debris is removed under the building's rules.
- 05
MEP, Build And Joinery
First-fix services, then partitions and ceilings, then flooring, tiling and joinery. Each trade starts only when the one before it has closed.
- 06
Finishes, Snagging And Handover
Painting, fixtures and a joint walk-through. Every snag is closed before handover and the space is cleaned.
Do You Need A Permit To Renovate In Dubai?
For anything beyond painting and furniture, usually yes. The table shows who normally has to approve what.
| Type Of Work | Usually Needs |
|---|---|
| Painting, loose furniture, like-for-like fixtures | Building management notice or consent only |
| New flooring, false ceilings, kitchen or bathroom replacement | Building or community NOC, sometimes a fit out permit |
| Moving walls, plumbing or electrical points | NOC plus a permit from Dubai Municipality, DDA or Trakhees, depending on location |
| Villa extensions or structural changes | Community NOC, authority building permit and engineer-stamped drawings |
| Fire alarm, sprinkler or exit changes | Dubai Civil Defence approval |
| Extra electrical load | DEWA approval |
General guidance only. Rules vary by building and community, so confirm the route for your property before work is priced.
How Much Does Renovation Cost In Dubai?
HFF's indicative range for interior work, which covers most renovations, is AED 200 to AED 1,500 per square foot. Structural work and extensions fall under construction, at AED 400 to AED 2,000 per square foot. Where a project lands depends on these factors:
| Factor | Why It Moves The Price |
|---|---|
| Condition of what is there | Old pipework or wiring found during strip-out usually has to be replaced |
| Layout changes | Moving walls, kitchens or bathrooms adds MEP work and permits |
| Wet areas | Kitchens and bathrooms carry waterproofing, tiling and plumbing in a small area |
| Materials and joinery | Stone against porcelain, veneer against laminate, custom against standard units |
| Occupied or empty | Working around residents means phasing, more protection and a longer programme |
| Building rules | Limited working hours, lift bookings and deposits add time and cost |
Indicative ranges, not a quotation. The binding price is the written quotation issued after a site visit.
What To Check Before Hiring A Renovation Contractor In Dubai
- Building contracting on the licence. A trade licence lists its activities. Structural, MEP and fit out work should sit with a company licensed to contract it.
- An itemised quotation. Labour, materials, permits and exclusions listed separately, so two quotes can be compared line by line.
- Who applies for permits. Agree it in writing, along with who pays the NOC deposit and authority fees.
- What happens with hidden problems. Ask how damaged pipework or wiring found during strip-out will be priced before it happens.
- Payments tied to progress. Staged payments against completed work, with the final payment after snagging.