Renovation Contractors In Dubai

Home, villa and office renovation by a licensed Dubai building contractor. Permits, strip-out, MEP, joinery and finishes, run by one team on one contract.

In Short
Dubai, UAE

What Does A Renovation Contractor In Dubai Do?

A renovation contractor in Dubai takes an existing home, villa or office and rebuilds the parts that need changing: layouts, ceilings, flooring, kitchens, bathrooms, electrics, plumbing and air conditioning. The contractor also secures the building NOC and any authority permit, runs the trades in the right order and hands the space back finished.

HFF Contracting & Interiors L.L.C holds Dubai commercial licence no. 1170369 for building contracting, and renovates apartments, villas, offices and restaurants from its office in Downtown Dubai.

Trade Licence
No. 1170369 Building contracting
Renovates
Apartments, villas offices and restaurants
Indicative Rate
AED 200 to 1,500 per sq ft, interior work
Site Visit
Free in Dubai written quotation after
Scope

Home, Villa And Office Renovation Under One Contractor

Most renovations in Dubai stall for the same reason: four or five trades each doing their own part, with nobody answerable for the gaps between them. The tiler waits for the plumber, the carpenter measures before the ceiling is fixed, and the building management office rejects a change nobody applied for. A renovation contractor exists to close those gaps.

HFF takes the whole job, from the first site measurement to the final snag list. That includes the paperwork, which on a Dubai renovation is often what decides the start date.

Apartments

  • Kitchen and bathroom renovation
  • Flooring and false ceilings
  • Wardrobes and built-in storage
  • Lighting and electrical upgrades
  • Work within tower rules and hours

Villas

  • Layout changes and extensions
  • Full interior refurbishment
  • Majlis, kitchen and bedroom upgrades
  • MEP replacement
  • Modification permits

Offices And Restaurants

  • Partitions and meeting rooms
  • Ceilings, lighting and HVAC
  • Power and data points
  • Kitchen and counter rework
  • Civil Defence requirements

Planning a new interior from scratch rather than rebuilding an existing one? See interior design or interior renovation.

Choosing

Main Contractor Or Separate Trades: What Changes For You

Hiring trades one by one can look cheaper on paper. Here is what each route puts on your plate.

QuestionSeparate TradesRenovation Contractor
Who plans the sequenceYou doThe contractor
Who applies for the NOC and permitsOften unclear, sometimes nobodyPart of the contract
When one trade damages another's workYou negotiate between themThe contractor fixes it
PriceSeveral quotes, gaps between themOne itemised quotation
Best suited toOne small, self-contained job, such as repaintingAnything touching layout, MEP or more than two trades
Process

How A Renovation Runs, Step By Step

  1. 01

    Site Survey

    The space is measured and existing plumbing, electrics, AC and structure are checked. Problems hidden behind finishes are cheaper to find now than after demolition.

  2. 02

    Scope And Quotation

    An itemised quotation listing what is included, what is excluded and the materials allowed for. Nothing starts until the scope is agreed in writing.

  3. 03

    Drawings, NOC And Permits

    Layout and MEP drawings go to building management for the NOC, and to the relevant authority where the work needs a permit.

  4. 04

    Protection And Strip-Out

    Floors, lifts and corridors are protected, and the areas being renovated are stripped back. Debris is removed under the building's rules.

  5. 05

    MEP, Build And Joinery

    First-fix services, then partitions and ceilings, then flooring, tiling and joinery. Each trade starts only when the one before it has closed.

  6. 06

    Finishes, Snagging And Handover

    Painting, fixtures and a joint walk-through. Every snag is closed before handover and the space is cleaned.

Permits

Do You Need A Permit To Renovate In Dubai?

For anything beyond painting and furniture, usually yes. The table shows who normally has to approve what.

Type Of WorkUsually Needs
Painting, loose furniture, like-for-like fixturesBuilding management notice or consent only
New flooring, false ceilings, kitchen or bathroom replacementBuilding or community NOC, sometimes a fit out permit
Moving walls, plumbing or electrical pointsNOC plus a permit from Dubai Municipality, DDA or Trakhees, depending on location
Villa extensions or structural changesCommunity NOC, authority building permit and engineer-stamped drawings
Fire alarm, sprinkler or exit changesDubai Civil Defence approval
Extra electrical loadDEWA approval

General guidance only. Rules vary by building and community, so confirm the route for your property before work is priced.

Budget

How Much Does Renovation Cost In Dubai?

HFF's indicative range for interior work, which covers most renovations, is AED 200 to AED 1,500 per square foot. Structural work and extensions fall under construction, at AED 400 to AED 2,000 per square foot. Where a project lands depends on these factors:

FactorWhy It Moves The Price
Condition of what is thereOld pipework or wiring found during strip-out usually has to be replaced
Layout changesMoving walls, kitchens or bathrooms adds MEP work and permits
Wet areasKitchens and bathrooms carry waterproofing, tiling and plumbing in a small area
Materials and joineryStone against porcelain, veneer against laminate, custom against standard units
Occupied or emptyWorking around residents means phasing, more protection and a longer programme
Building rulesLimited working hours, lift bookings and deposits add time and cost

Indicative ranges, not a quotation. The binding price is the written quotation issued after a site visit.

Before You Hire

What To Check Before Hiring A Renovation Contractor In Dubai

  • Building contracting on the licence. A trade licence lists its activities. Structural, MEP and fit out work should sit with a company licensed to contract it.
  • An itemised quotation. Labour, materials, permits and exclusions listed separately, so two quotes can be compared line by line.
  • Who applies for permits. Agree it in writing, along with who pays the NOC deposit and authority fees.
  • What happens with hidden problems. Ask how damaged pipework or wiring found during strip-out will be priced before it happens.
  • Payments tied to progress. Staged payments against completed work, with the final payment after snagging.
Gallery

Renovation And Joinery Work

Renovated room with floor-to-ceiling timber shelving and carved wood screen panels
Renovation drawings being marked up on a workbench beside timber and tools
Carpenter checking cut timber boards for renovation joinery
Master bedroom interior design with padded headboard wall, chandelier and cove ceiling lighting

View Projects

Questions

Renovation In Dubai: Common Questions

How much does it cost to renovate in Dubai?
HFF's indicative range for interior renovation is AED 200 to AED 1,500 per square foot, and AED 400 to AED 2,000 per square foot for structural work or extensions. The binding price is a written quotation issued after a free site visit within Dubai.
Do I need a permit to renovate my apartment or villa in Dubai?
Anything beyond painting and furniture usually needs a building or community NOC. Moving walls, plumbing or electrical points also needs a permit from Dubai Municipality, DDA or Trakhees, depending on where the property is.
Can I live in my home during the renovation?
For a kitchen, bathroom or single-room renovation, often yes, if water, power and one working bathroom stay available. Whole-home work involving strip-out and MEP changes brings noise and dust, and moving out for that phase is usually easier.
What does a renovation contractor do that separate trades do not?
A renovation contractor plans the sequence of trades, applies for the NOC and permits, and is responsible for the finished result. With separate trades, those tasks fall to the owner.
How long does a renovation take in Dubai?
It depends on the size of the work, how long the building and authority approvals take, and material lead times. A realistic programme is set once the scope is agreed, and should be in writing before work starts.
Does HFF renovate offices and restaurants as well as homes?
Yes. HFF renovates apartments, villas, offices and restaurants. Commercial renovations usually also need landlord approval and Dubai Civil Defence sign-off.