In Short
Dubai, UAE

What Is Interior Renovation?

Interior renovation replaces the finishes and fittings inside a home or office while the layout and structure stay as they are. Typical work includes new flooring, wall treatments, false ceilings, lighting, kitchen cabinets, bathroom fittings and wardrobes. Because walls and slabs are not moved, it is usually quicker, cheaper and simpler to approve than a full renovation.

HFF Contracting & Interiors L.L.C holds Dubai commercial licence no. 1170369, issued by the Department of Economy and Tourism, for building contracting and for decoration design and implementation. Kitchens, wardrobes and panelling are made in its own workshop in Al Quoz.

Trade Licence
No. 1170369 Building contracting
Renovates
Apartments, villas and offices
Indicative Rate
AED 200 to 1,500 per sq ft, interior work
Site Visit
Free in Dubai proposal in 3 to 5 days
Scope

Room By Room: What An Interior Renovation Covers

Most people start with one room and a list of complaints: a kitchen that has worn badly, a bathroom with tired grout and poor water pressure, floors that look dated, lighting that leaves half the room dark. Interior renovation deals with all of that without the cost and approvals that come with moving walls.

The useful question at the start is what you are keeping. Keeping the layout, the kitchen position and the bathroom drainage keeps the project in interior renovation. Moving any of them turns it into a structural renovation.

Kitchens And Bathrooms

  • New kitchen cabinets and worktops
  • Splashbacks and wall tiling
  • Vanity units and sanitary ware
  • Shower screens and fittings
  • Waterproofing renewed

Floors, Walls And Ceilings

  • Porcelain, stone, vinyl or timber flooring
  • Wall panelling and feature walls
  • Paint and specialist finishes
  • False ceilings and cove lighting
  • Skirting and doors

Lighting And Joinery

  • Lighting layouts and fittings
  • Switches and sockets replaced
  • Wardrobes and walk-ins
  • TV units and shelving
  • Made in the HFF workshop
Choosing

Interior Renovation Or Full Renovation?

The difference decides your budget, programme and paperwork, so it is worth settling first.

QuestionInterior RenovationFull Renovation
Do walls move?NoYes
Do the kitchen or bathrooms move?No, same positionsOften
Approvals usually neededBuilding or community NOCNOC plus an authority permit, sometimes engineer drawings
Typical disruptionRoom by room, often livableUsually best to move out
Where to lookThis pageRenovation contractors
Process

How An Interior Renovation Runs

  1. 01

    Site Visit

    The rooms are measured and the condition of existing plumbing, electrics and AC is checked. The visit is free within Dubai.

  2. 02

    Selections And Proposal

    Flooring, tiles, joinery finishes and fittings are chosen, and a fixed price proposal follows within 3 to 5 working days.

  3. 03

    Building NOC

    The renovation scope is submitted to building management or the community for the NOC, and working hours are agreed.

  4. 04

    Protection And Strip-Out

    Floors, lifts and corridors are protected. Old finishes, cabinets and fittings are removed and debris is taken away under building rules.

  5. 05

    Install

    Ceilings and electrical points first, then flooring and tiling, then joinery from the workshop and final fittings.

  6. 06

    Snagging And Handover

    A walk-through together, every snag closed, and the home or office cleaned before handover.

Living In

Can You Stay At Home During The Work?

Often yes, if the work is phased and one bathroom stays in use. A rough guide:

WorkUsually Livable?
One bathroom, with a second working bathroomYes
Kitchen renovationYes, with a temporary set-up, for most families
Flooring across the whole homeDifficult, as furniture has to move room by room
Painting and wall finishesYes, in phases
Several rooms at onceMoving out for the busiest phase is usually easier
Budget

How Much Does Interior Renovation Cost In Dubai?

HFF's indicative range for interior work is AED 200 to AED 1,500 per square foot. The main things that move the price:

FactorWhy It Moves The Price
Floor areaFlooring, paint and ceilings are priced by area
Kitchen and bathroom countWet areas carry waterproofing, tiling and plumbing in a small space
Material choiceNatural stone against porcelain, veneer against laminate
JoineryCustom wardrobes and kitchens cost more than standard units, and last longer
Hidden conditionOld pipework or wiring found behind finishes may need replacing
Building rulesRestricted hours and lift bookings lengthen the programme

Indicative ranges, not a quotation. The binding price is the fixed price proposal issued after the site visit.

Before You Start

What To Decide Before Renovating

  • What stays and what goes. Layout, kitchen position and bathroom drainage decide whether this is an interior renovation or a structural one.
  • Your building's rules. Working hours, NOC requirements and deposits differ between towers and communities.
  • Selections before work starts. Tiles, flooring and joinery finishes chosen up front avoid delays on site.
  • Whether you will stay. It changes the sequence and how rooms are phased.
  • A written, itemised price. Materials and exclusions listed, with payments tied to completed stages.
Gallery

Renovation And Joinery

Renovated room with floor-to-ceiling timber shelving and carved wood screen panels
Living room interior design with rattan pendants, built-in shelving and a dining corner
Master bedroom with a quilted headboard wall, chandelier and tufted bench
Carpenter checking cut timber boards for renovation joinery

Photos show the type of work covered on this page.

View Projects

Questions

Interior Renovation In Dubai: Common Questions

What is the difference between interior renovation and full renovation?
Interior renovation replaces finishes and fittings while walls, kitchen and bathroom positions stay where they are. A full renovation moves walls or wet areas, which needs more approvals and usually a longer programme.
Do I need a permit for interior renovation in Dubai?
Most interior renovations need a building or community NOC. Like-for-like changes such as painting may only need building management consent, while moving walls or plumbing needs an authority permit.
How much does interior renovation cost in Dubai?
HFF's indicative range for interior work is AED 200 to AED 1,500 per square foot. The binding price is a fixed price proposal issued after a free site visit within Dubai.
Can I live at home during the renovation?
Often yes, if the work is phased and one bathroom stays usable. Whole-home flooring or several rooms at once are usually easier with the home empty.
Does HFF renovate kitchens and bathrooms?
Yes. Kitchens and bathrooms are renovated with new cabinets, worktops, tiling, sanitary ware and renewed waterproofing. Kitchen cabinets are made in the HFF workshop.
How long does a three bedroom villa interior take?
A three bedroom villa interior typically takes 8 to 12 weeks from contract signature to handover, not counting approval time.
Is HFF Contracting & Interiors a licensed contractor?
Yes. HFF Contracting & Interiors L.L.C holds Dubai commercial licence no. 1170369, issued by the Department of Economy and Tourism, covering building contracting and decoration design and implementation.